An Infor LX upgrade in a month? Crossroads consultants make it happen!

In August, BISCO, Inc. based in IL went live on their new IBMi 9 with Infor LX. This project included a dual migration from IBMi 7 to IBMi 9 and an upgrade from LX 8.3.4 to LX 8.3.5 using webtop. The Crossroads team led by Tim Baker, made this all happen in just a little over a month. BISCO will immediately move into the next phase of the project which will focus on an implementation of the Avalara Tax Interface to LX.

As stated by BISCO’s Senior Manager of Information Technology, “I want to express our complete gratitude for what a great job Crossroads RMC did in helping us get our BPCS LX Upgrade up and running. We were struggling to get over that hump and just couldn’t seem to bring this ERP to life… Crossroads RMC came in and saved the day, a fantastic job and the effort put forth was 2nd to none. Big Shout out to Tim Baker!!  I would highly recommend Crossroads RMC to any company.

BISCO is an ISO 13485 certified manufacturer of medical devices for the dental industry, specializing in adhesive and resin composite technology. Established in 1981, BISCO is an industry leader providing technically innovative aesthetic and restorative products to dental customers in the U.S. and in over 60 countries worldwide.

Learn more about Crossroads RMC Services>

Previous Article Infor LX & BPCS Tip of the Week: WebTop
Next Article Infor LN & Baan Tip of the Week: Wrap Toolbar Option
Print
29124 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: