Infor LX & BPCS Materials Tip: Unique ID Generator / Unique Sequence Number

Serial Number Unique ID Generator - The new Serial Number Unique ID Generator program (INV599B3) is used to generate a unique value that groups a set of serial numbers that should be treated as part of a single, comprehensive set of inventory transactions.

Assign Unique Sequence Number - The new Assign Unique Sequence Number program (SYS046B) is used by any program that posts an inventory transaction, that is, writes an ITH record, to assign an absolutely unique and unchanging sequence number for each ITH record about to be written. SYS046B follows these steps to create the unique sequence number: 1 Reads the Item Serialization Extension file (IME) to retrieve the last unique sequence number used 2 Increments the last unique sequence number by one 3 Updates the IME record with this incremented last unique sequence number 4 Returns this incremented last unique sequence number to the calling program.

Previous Article Infor LN & Baan Tip: Can You Backflush An Item If Estimated Quantity is Zero?
Next Article How often are you counting your inventory? Are inaccurate counts affecting your ability to satisfy customer orders?
Print
21827 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories