How Do I Determine If MES Is Right For My Business?

There are certain key questions that must be answered to determine whether or not an MES system would benefit your organization: 

  • How do you analyze OEE?
  • Is there an opportunity to reduce WIP inventory, indirect labor, downtime, waste or scrap?
  • What is the cost and impact of producing and distributing shop paper including drawings and work instructions?
  • Would you like to go paperless on your shop floor?
  • How are your continuous improvement initiatives tied to your ERP?
  • Is Management requesting real time production status reporting via dashboards or drilldown reports?
  • What different “islands of automation” exist on your shop floor?

The answers to each of these questions could have a significant impact on the profitability of your business. Want to quantify your results? Contact George Moroses today to schedule your FREE MES ROI Analysis.

Previous Article Consulting: Methodology for Infor LX & BPCS Upgrades
Next Article OTTO: Making plans happen isn’t just about monitoring material shortages
Print
23709 Rate this article:
No rating
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories