Infor LX & BPCS Tip: How Items Are Selected for a Cycle Count

The Cycle Counting Sub-System Within Inventory Management

The system uses the following information as the basis for cycle counting selection:

  • Cycle Counts/Year: The system calculates the time between cycle counts based on your entry in this Item Master file field for each item (optional).
  • Last Cycle Count Date: This date is in the Location Inventory file, ILI, if you use locations, or in the Warehouse Inventory file, IWI, if you don't.

The system adds the time between cycle counts (calculated as described above) to this date. If the result is less than or equal to today's date, the item is selected for cycle counting. If it is greater than today's date, the item is not selected, it is not due yet for cycle counting.

There is another special condition that causes an item to be selected for cycle counting. If the ILI/IWI record of the item has a Y in the Cycle Flag field, the item is selected automatically. This flag indicates that the item's on-hand balance has gone to a negative value sometime since the last cycle count. That applies even if the value is not negative at selection time. The programs that can set this field are INV500D, INV510, and BIL540.

You can also limit the items selected for counting by specifying limits of the item numbers or warehouses to be searched.

Previous Article Mitigating Risk With Your Infor ERP
Next Article Infor LN & Baan Tip: Project Status Options
Print
15064 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last