Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item

Changing an item from serialized to not serialized can only be done by unchecking the Serialized flag in session Item - General (tcibd0101s000). 
The conditions for this are:

  • On Hand inventory is 0.00
  • On Order inventory is 0.00
  • Allocated inventory is 0.00

There are no records in the Inventory Transactions by item (whinr1510m000). Instead of removing all allocations and inventory, a new item may be created to replace the serialized item via the session Alternative Items (tcibd0505m000). Alternatively, the item can be converted from serialized in inventory to serialized not in inventory. 

In Item – Warehousing (whwmd4500m000) all the serial registration flags can be set to “No” and a Lot and Serial Registration Template (whwmd4102m000) can be linked in which all registration is explicitly excluded. In this way, although still serialized, the item is not subject to any serial registration and acts like a not serialized item.

Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products
Next Article Is it time to get more out of your ERP?
Print
17205 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: