Infor LX & BPCS: Waste in Manufacturing

What if you could eliminate waste and optimize your business for $5/day?

Crossroads MES (Manufacturing Execution System) captures all of your ERP production data and harnesses the power of that data to increase your team’s efficiency by providing the right information at the right time to the right people. 

Reducing waste enables manufacturers to save money and increase productivity.
Where is the waste happening in your processes? How often is your department spending time and resources on the following tasks?

Manufacturing:

  • Correcting repeated problems with production quality
  • Juggling manual production schedules
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material resource needs


Materials:

  • Correcting deliveries with missing or wrong items
  • Sending overstocked inventory back to a warehouse or other location
  • Searching for raw materials, tools, or other equipment
  • Waiting on a late delivery from a supplier


Finance:

  • Managing increasing carrying costs of inventory
  • Dealing with budget overruns on projects
  • Managing cash flow due to unnecessarily long lead times and shipment times
  • Constantly evaluating labor and material costs to get overall production costs down


Company-wide:

  • Correcting repeated problems with production quality
  • Correcting deliveries with missing or wrong items
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material costs to get overall production costs down

Request a demo

Previous Article Infor LX & BPCS Tip: Have you considered WebTop?
Next Article Infor LN & Baan Tip: All About Invoicing Methods
Print
17084 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories