Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions

This enhancement provides expanded field sizes for many key manufacturing data elements. This expansion impacts panels, reports, work fields, as well as parameters and other technical areas.

The benefits of the expanded field enhancement include: 

  • Support for companies that have global operations in a single database.
  • Improved data accuracy due to additional decimal points.
  • Improved data accuracy due to additional capacity for totals and summaries.
  • Provides more definitions of additional values, including more meaningful values due to fewer abbreviations.
  • Provides a greater number of days for data retention.
  • Meets regulatory requirements or industry standards.
  • Avoids re-use or duplication of keys.

The programs or areas impacted include:

  • Shop Order Number (9N)
  • Summary Quantity fields (13,3)
  • DWM Summary Weight fields (13,4)
  • Transaction History Sequence (16N)
  • Instrument Serial Number (50A)
  • Item Class (5A)
  • Item Discount Code (5A)
  • Shop Order Priority Code (2N)
  • Catalog String (512A)
  • Comment (35A on ECM TITB file)
Previous Article Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders
Next Article Infor LN & Baan Tip: Open Transactions Check – LN 10.7
Print
9752 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: