What is the right balance of KPIs to make sure your production line is running at peak performance?

Analytics Dashboard

How can we make sure the production line is running at peak performance?

One very effective way is to put the right balance of production KPIs in place. Some of these are leading indicator KPIs that help provide insight into future performance and some are results KPIs that tell you how you have done. It is good to have both.

Check out this list of 21 examples of KPI indicators for 2020 to help improve manufacturing performance.

Analytics Dashboard for Infor LN & Baan
Analytics Dashboard for Infor LX, BPCS & Infor M3

Previous Article Consulting News: It's Time for the Crossroads RMC Utilization Review
Next Article Join us in St. Louis for inPOWER 2020!
Print
30812 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: