Crossroads RMC and Kardex Remstar Partner to Provide Solution for L3 Electron on Infor LN

L3 Electron has selected Crossroads RMC to develop a connector from Kardex Remstar’s Power Pick Global software to Infor LN. Power Pick Global facilitates batch picking, allowing an operator to fill multiple orders at one time, increasing productivity significantly. Multi-user-picking provides the flexibility to easily add additional labor to further increase picking speeds when order volume is high. Optical indicators such as Pick-to-Light and Put-to-Light direct the operator to the exact location of the pick, increasing accuracy and reducing the number of picking errors. L3 Electron is a technology company specializing in the manufacture of microwave devices for ground-based, airborne and satellite communications and radar. Go live is scheduled for late Q3 of 2017.

Previous Article BPCS/LX Tip of the Week: Operational Inefficiencies
Next Article Blueprint for Labeling Success
Print
29967 Rate this article:
3.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.