Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders

In previous releases, the Check Inventory Sales Order (tdsls4217m000) session was used to provide planned delivery dates to sales order lines by performing ATP checks only during order entry.

The Check Inventory Sales Order (tdsls4217m000) session has been enhanced to support the ATP recalculation of planned delivery dates. ATP checks can now be run on sales order lines with the Order Promising Status set to Accepted. Simulation capabilities and exclusion of already advised sales order lines are also offered.

The new functionality can be enabled for a combination of item and business partner. At sales order line level, the option to disable the recalculation is always available.

Previous Article Infor LX & BPCS Tip of the Week: LX 8.4 Enhancement – Company Security for ACR510
Next Article Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions
Print
21996 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

In the Item Master File, the requirements code is used to specify the type of demand for the item. Planned order requirements are determined from the type of demand. If the requirements code is left blank, the planning systems treat the item as a sum code (3).
 

Other options for the field are:


1 = Dependent demand that is indirectly generated from the parent item requirements.

2 = Independent demand generated from customer orders and forecasts.

3 = The Sum of both independent and dependent demand.

In SFC600, there is no code to capture the time spent on re-work. Re-work is usually at a specific operation, or when the part is finished and QC determines that re-work is required in order to pass inspection. You are faced with deciding on how to report the additional labor time.

Do you continue to report it against the operation, or create a re-work shop order?

If you are re-working through a specific operation you can capture the time as run labor with the SFC600 program. Now you need to deal with the variance of actual to standard time and what impact this has on costing.
First146147148149151153154155Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: