10 Ways to Not Screw Up the OEE Project – It is More Important than You Think

Is there a mandate in your company to increase OEE and it has landed on your plate? Ah yes, the OEE approach. You remember what that is right? The Overall Equipment Effectiveness metric as developed in Japan during restoration made famous in crafting some serious efficiency. Well, someone in management has decided that THIS is the way to make his world better and now it’s up to you to make it happen.

But there are pitfalls along the way:

  • Somebody is going to tell you that the best way to start is collecting data manually so that you can understand the process better.
  • Somebody else is going to say that “your” OEE is fine, but the real problem is _____________  (fill in the blank from the following:  SPC, lot tracking, scrap, downtime, indirect time, maintenance, line scheduling, set-up reductions, etc., etc.)
  • Somebody “big” (The VP Ops) is going old school and needs proof that an OEE system will work for his people.

This puts you in a tight spot. An OEE project requires that a lot of people get involved and they’ll all have their own ideas. Try to satisfy them all and you’ll have a 6 figure project with 18 months to implement. Even if it gets approved, good luck getting it implemented successfully. This could get ugly if you’re not careful.

Mach two and the problems that occur at speed.

Should you be concerned about any of this? Guess what, you’re right. Picture this – the crazed Line 1 supervisor approaches you with a can of red paint in one hand and a paintbrush in the other. As he lays out his requirements, he quickly paints you into a corner, smiling the whole time. Once he has you where he wants you, he lights his hair on fire and then leaves! After all, he has a lot of work to do.

I’ve seen this scenario played out many times. OK, maybe the “hair on fire” thing is a bit extreme, but you know what I’m talking about. Over and over, the same issues arose. OEE is great, but what about labor? We can’t spend time collecting data – it will take away from making products. The system has to be idiot-proof because our people aren’t computer savvy.

Is the Key to happiness a good OEE?

Not everyone has the same priorities. Importance is relative in the big picture. And what’s important today may not be tomorrow. So how do you put together a project that will address the desires of all the stakeholders? What’s the best way to navigate the political landscape that’s been laid out in front of you without getting off course? I have to be honest with you. Most of these projects fail before they’re implemented and never get off the ground. Now it’s up to YOU to make sure that doesn’t happen.

And get the efficiency you know is buried in the system and the data that comes out of it.

What if you had a plan going-in that could deal with all of this? Your life will be easier, you’ll get the recognition you deserve, and you may become known as that “someone who can get things done”.

Remember your 7P’s: Proper Planning and Preparation Prevents Piss Poor Performance. 

10 Ways to Succeed at an OEE Project Where 90% Fail at Trying

  1. Collect the requirements.  Learn from everyone with the intent of developing a phased approach to implementing on your shop floor with OEE being Phase 1.
  2. Create your list.  Capture all of the required functions, taking into account what the “output” of the system will be. What does the plant manager need to see in real-time? What KPI’s does each line need displayed in real-time? What reports are required?
  3. Insist Upon Real-time.  In the moment data for the right OEE is the right approach.  If it’s possible, collect the data automatically. Remember that real-time feedback to line operators results in an automatic increase in OEE.
  4. Evaluate your lines.   Focus where production counts can be monitored automatically. If the data is in your PLC’s, can you get it out? OPC communication is the right way to go here. If not, the approach is to install a new dedicated PLC with sensors installed on each line.
  5. Find Your Data Points.  If automatic production monitoring is not applicable, what will be your collection points and how will you collect the data?
  6. Calculate the Load.  Determine how to load the “job” you’re reporting on into the OEE system. This will typically be the order/operation or the product from the ERP.
  7. Recognize Great Data. Do not accept “manual collection of data” as a viable approach because it produces false results and is labor-intensive.
  8. Be Tough.  Evaluate systems based on OEE specificity to start and expandability to future phase functions as determined by your requirements. Plan to justify the OEE purchase on its own merits.
  9. Go Easy.  Make sure the system is easy to implement. Software installation and configuration should take no more than 2 weeks.
  10. Be Simple.  Put together a detailed but simple project plan indicating who will do what, how long it will take, and how you will monitor progress.

Execution is Everything

So now you have a plan with knowledge of the challenges that will occur and how to deal with them. This is a plan that is well-tested and that works, so your chances for success are good. Don’t worry, you may not be an expert in OEE at this point but you will be shortly. And best of all, you’ll not only look like you know what you’re doing, you actually will.

An Expert is someone who attempted the unachievable and survived to tell about it.

Ok, let’s go get that data and turn it into real information that can be used to improve OEE, not just monitor it.

And remember, you are not alone in this.  There are many people cheering you onward --  including us.  If you need a little encouragement, don’t hesitate to call.

About the author:

Rich Grilli is the president of Crossroads RMC, which helps manufacturers optimize their operations. He is a long-time numbers-guy and engineer who has a passion for systemic models that work. Rich is very interested in designing, planning, and analyzing different aspects of a company's production methods. Because he’s been around many manufacturing plants worldwide, he has developed a deep understanding about coordinating/improving quality control, implementing new strategies for product assembly, troubleshooting inefficiencies, and making process improvements that make a difference.

Previous Article What's Your M.O.?
Next Article How Internet of Things (IoT) Big Data Will Transform Manufacturing Automation
Print
32549 Rate this article:
5.0
Rich Grilli

Rich GrilliRich Grilli

Other posts by Rich Grilli

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories