Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

Manufacturing: How much time are you wasting on manual processes?

It tells us that there is a great need for a review of your manufacturing processes.

Manual processes around labor reporting, production completions, issuing of material, inspection approvals, serialization, and more can weigh down the entire shop floor team and can be the source of significant errors. Your business and your customers’ needs have changed and you are in a constant battle to keep up. It is hard to know which area to tackle first and where the greatest impact can be made.

That's where the Crossroads RMC Manufacturing Utilization Review comes in. Whether you're on an old version of BPCS or Baan, or the latest version of Infor LX or Infor LN, odds are there are aspects of Manufacturing / Production Control in the ERP system that doesn't fit your business's current strategy. Do you throw out the software and start with something new? Odds are that is overkill. Sometimes it just boils down to taking the time to understand how your current state matches up with your corporate strategy, understanding the gaps, and developing a plan to get you from point A to point B.

We have successfully helped companies transform their business in the areas of: 

  • Planning / Scheduling
  • Shop Floor Control
  • Final Assembly
  • Quality Control
  • Production Control
  • Forecasting
  • Work Centers / Routings / Bill of Materials

Our consultants have 30+ years of experience that bring about REAL change. We work at your pace and in a way that makes the most sense to your business. Our consultants can review current usage and related business processes of your entire ERP system, or a particular area like Manufacturing / Production Control, and make recommendations that will reinvigorate your ERP system and those that use it.

A utilization review can be performed 100% remotely via phone or web meeting, or in person, following safety guidelines.

Get started > with a FREE 1-hour phone assessment to determine if your business can benefit from a Manufacturing Utilization review!

Sources: McKinsey.com & productionmachining.com

Previous Article The Best Baan IV | Baan V | Infor LN Financial Reports to Analyze Company Performance
Next Article The Best BPCS | Infor LX Manufacturing Reports to Analyze Company Performance
Print
27096 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories