Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LN & Baan Tip: Did you know? PBOM – Effective Dates
Kathy Barthelt

Infor LN & Baan Tip: Did you know? PBOM – Effective Dates

Materials and Manufacturing

Did you know? PBOM – Effective Dates

Some customers have noticed that when a PBOM is pushed from Engineering to Production, the effective date of the PBOM component lines does not match the effective date of the revision of the PBOM component.

Here is how it works:

1. The effective date on a PBOM line is the date the item became effective in PBOM. This means that if the parent item is revision controlled, the effective date on the line relates to one of the revision dates of the parent item.
2. The effective date in a PBOM can be changed. This will lead to a disconnect between engineering and PBOM dates.
3. The a PBOM line can have a revision. However, the effective date on the PBOM line is not the effect of the revision of this component.

Previous Article Crossroads RMC's support team is friendly, well trained, experienced, and committed to resolving your support & technical issues as quickly & effectively as possible.
Next Article Infor LN & Baan Finance Tip: How to clear balances on invoices that will be moved to a new company
Print
24958 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories