Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS Tip: Return Material Authorization (RMAs)

The Return Material Authorization process, RMA, controls and monitors the return of goods. Infor LX generates an RMA which mirrors the terms and conditions of the return. You can copy the RMA from a processed invoice or create it independently of an existing order. If you copy an invoice to create an RMA, Infor LX copies only regular lines, not special lines. You can manually add special lines as credits on the RMA. Enter RMAs in the same manner as a customer quote. Like a customer quote, an RMA has no immediate effect on inventory, accounts receivable, sales, or the general ledger. Infor LX then generates a Return Material Document which provides the customer with the authorization to proceed with the return. Internal procedures, return reason codes, and instructional notes on the RMA identify the disposition processing. You can perform credit processing and determine update effects by entering the RMA number and assigning the appropriate order type.

Previous Article Infor LN & Baan Tip: Pro Forma Invoice
Next Article Check-Ups are important… Including Infor LX & BPCS ERP Check-Ups!
Print
21546 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories