Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: RMCbuild

Managing the Inventory Risk

Infor LN & Baan

Proper inventory management and planning is not for the weak!

Any of these ever happen to you?

  • My supplier can’t provide the raw materials I need when I need them because I waited too long to order.
  • I underestimated how much raw material I had on hand and now my customer’s order is waiting on hold until I can get the parts I need.
  • I couldn’t meet the desired delivery date for my customer’s order, so they took their business somewhere else.
  • I ordered too many raw materials or made too many sub-assemblies because I didn’t have good visibility to my on-hand inventory.

RMCbuild makes inventory management easy. With RMCbuild you can view all raw materials, on-order inventory, work-in-progress, sub-assemblies and finished goods all at once, and have a complete snapshot of your inventory in seconds. Now you know whether or not you can build the number of finished goods required. You can get this with RMCbuild!

Learn More > RMCbuild

Get a demo

Previous Article LN & Baan | LX & BPCS Tip: 9 Tips for Secure Manufacturing Business Systems Through OT Cybersecurity Vulnerability Management
Next Article Infor LX & BPCS Tip: The Top 6 Benefits of CLD
Print
9438 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories