Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS: Waste in Manufacturing

What if you could eliminate waste and optimize your business for $5/day?

Crossroads MES (Manufacturing Execution System) captures all of your ERP production data and harnesses the power of that data to increase your team’s efficiency by providing the right information at the right time to the right people. 

Reducing waste enables manufacturers to save money and increase productivity.
Where is the waste happening in your processes? How often is your department spending time and resources on the following tasks?

Manufacturing:

  • Correcting repeated problems with production quality
  • Juggling manual production schedules
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material resource needs


Materials:

  • Correcting deliveries with missing or wrong items
  • Sending overstocked inventory back to a warehouse or other location
  • Searching for raw materials, tools, or other equipment
  • Waiting on a late delivery from a supplier


Finance:

  • Managing increasing carrying costs of inventory
  • Dealing with budget overruns on projects
  • Managing cash flow due to unnecessarily long lead times and shipment times
  • Constantly evaluating labor and material costs to get overall production costs down


Company-wide:

  • Correcting repeated problems with production quality
  • Correcting deliveries with missing or wrong items
  • Holding up production due to delayed component deliveries
  • Constantly evaluating labor and material costs to get overall production costs down

Request a demo

Previous Article Infor LX & BPCS Tip: Have you considered WebTop?
Next Article Infor LN & Baan Tip: All About Invoicing Methods
Print
17043 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories