Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

inPower 2024 - Join Gold Sponsor Crossroads RMC
Frank Petrasio
/ Categories: Infor

inPower 2024 - Join Gold Sponsor Crossroads RMC

Monday Sept 23 - Thursday Sept 26, 2024 | The Ingleside Hotel, Pewaukee WI

Crossroads RMC is a Gold Sponsor of the upcoming inPower 2024

Registration is now open. Join us for hands-on workshops, product roadmaps, customer-led and educational deep dive sessions, and more. Many individual vendors will offer specific solutions to make life easier for the Infor LX users. Don't miss this chance to elevate your skills, enrich your network, and shape the future of your business.

Format: The general flow of the conference will be similar to 2023, with the addition of Enterprise Integrator educational sessions on Monday and expanded educational content on Wednesday, due to popularity in 2023.

Full agenda coming soon! 
Agenda Sneak Peak

inPower 2024 sneak peak slide

📅 Event Dates: September 23-26 📍 Location: Ingleside Hotel, Pewaukee, WI


What's in Store for You:

🎯 Over 100 enlightening sessions by Infor, partners, and customers.

🎙️ Keynote sessions that set the tone for innovation.

💡 Workshops tailored to your expertise level.

🤝 Ample networking opportunities to connect with like-minded professionals.

🚀 Pricing & Registration: https://ibmi.workoutloud.com/Event/inpower-2024/Register

Stay tuned for session updates and event highlights. Let's power up the future of Infor LX together at inPower 2024!

Previous Article DON'T MISS - 8 Ways to Modernize your IBM i Product– Topic #3 of 8: Best practices in integration for the office of finance (Part 2)
Next Article Infor LN & Baan Tip: Outbound Order Lines
Print
7330 Rate this article:
5.0
Frank Petrasio

Frank PetrasioFrank Petrasio

Other posts by Frank Petrasio

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories