Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Partner News, Infor

Infor News You Can Use: Infor Velocity Summit

October 1-2, 2024 (Las Vegas) & October 22-23, 2024 (Amsterdam)

Antiquated technology has no place in today’s fast-moving world

To succeed, you need to move with velocity—this means not just moving fast, but with purpose and precision. Velocity-powered businesses measure success by the value created at every turn, not just by speed.

At the Infor Velocity Summit, we’ll unveil our latest innovations across generative AI, process intelligence, ESG, and more, distilled from our work with 60,000 customers and built for your industry, from the ground up.

Discover how possible happens>  https://www.infor.com/events/infor-velocity-summit

Previous Article The Far-Reaching Impact of Disconnected Data: From Operations to the Executive Suite
Next Article Infor LN & Baan Tips & Tricks for FINANCE: Ledger Account Blocked Error
Print
4343 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories