Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel

Conversion of SiM Tasks for WFi Workflows

This enhancement simplifies access to LX programs that are available through System i Manager (SiM), as well as Workflow for System I (WFi). This provides an easy way to promote common WFi business processes from one LX environment (for example, test or environment) to another LX environment (for example, production). 

LX also provides a set of four-character task codes that can be used within SiM, System i Workspace (SiW), and WFi, for default programs in LX. These predefined LX task codes begin with 0,1,2,3, or 4. Users can specify task codes for their custom programs that are flagged as valid menu options in LX, but these task codes cannot begin with 0,1,2,3, or 4. Users can specify the task codes in Infor LX Object Master Maintenance, SYS625D. This enhancement provides simplified access to LX programs that are flagged as valid menu options in System i Manager and Workflow for System i environments. In SYS625D, The user can also specify task codes in SYS625D for customized programs that are flagged as valid menu options.

Previous Article Does your existing data collection equipment and barcode label printers need some love and attention?
Next Article Infor's Support Schedule for LX & BPCS
Print
43219 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories