Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Event / News

Pushing Forward In the Face of Adversity. Soundview recently suffered a major loss when fire struck on January 30, 2019.

Soundview Paper lost their main building when disaster struck. This building housed offices, their computer center and part of their manufacturing facility. The loss including hardware, networks, system data backups, etc. Crossroads RMC was contacted immediately to assist in the recovery of their BPCS V6 system. With limited backups and a full team effort, Crossroads RMC assisted in the acquisition of new hardware and are currently in the midst of helping to bring their system back to life. Soundview has secured support from various partners to make all this happen, and we are privileged to be part of the team. A lot of work has been done so far, but we have a long road ahead. Users will soon regain access by the end of this week,  and as required, Crossroads RMC will provide the necessary consulting support from our LX team to get Soundview back up and running. We are communicating with them daily, as we work thru this process.

Previous Article BPCS/LX Tip of the Week: Facility Period Close
Next Article Anthony Etzel- Featured Speaker at inPower 2019
Print
19656 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories