Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel

Amerequip Goes Live With OTTO On-Time Orders

Crossroads RMC welcomes Amerequip as our newest client after successfully going live with OTTO, On-Time Orders.

Amerequip, with corporate headquarters in Kiel, Wisconsin, is a leading designer and manufacturer of accessories and attachments for the construction, utility, and industrial equipment, lawn and turf-care equipment, and related products sold in global markets served by their OEM partner customers.

Amerequip’s objective was to improve on time customer order shipments, reduce expediting, and cut down on the time their knowledge workers were spending digging for information. After carefully conducting their due diligence they chose OTTO to address these challenges.

OTTO helps manufacturing plants consistently meet customer commitments by performing predictive analysis to help prevent surprises and allow for early detection and resolution of potential issues. OTTO improves effectiveness of knowledge workers by reducing “data mining” required to answer customer order status questions, and improves the flow of material through the plant, as a result, reduce shortages and improve on-time customer order shipments. OTTO previously won the prestigious APICS Innovation Award of Excellence”.

We are proud to have Amerequip as our client and look forward to being a strategic partner and support their company growth and success.

Previous Article Infor LN & Baan: Need real time information for Finance, Production, Inventory, Sales and more?
Next Article Infor LX & BPCS Tip of the Week: 6 Powerful Steps to Win with Automation
Print
28492 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories