Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

April 25th 2018 -LUNCH & LEARN WEBINAR FOR Baan & LN

NAZDAQ's B2Win Suite: Giving You Maximum Control Over Your ERP Output


Lunch & Learn Webinar for Baan & LN! 

- Giving You Maximum Control Over Your ERP Output -

NAZDAQ's B2Win Suite is the output management platform that every company needs in conjunction with its ERP system. This innovative product helps companies improve internal reporting and outbound communications.


Register today to learn how each core application is integrated into your system’s infrastructure to expand functionality, automation and improve business efficiency.

Here are a few features: 

  • Can be hosted on-premise or in cloud
  • Works with all Baan / Infor® LN versions and Mingle
  • Comes ready to work with various enterprise systems (ERP, CRM, SCM, etc.)
  • Connects with various multiple enterprise systems simultaneously (CRM, ERP, etc.)
  • Transform your ERP into different formats
  • Design completely custom formatting

 

Join us for 45 minutes: 


Watch Recorded Webinar

Previous Article Crenlo and Crossroads RMC Go International
Next Article Tip of the Week: What is Your M.O.?
Print
34461 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories