Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses

Consulting News: How comprehensive is the Crossroads RMC ERP business audit & how does it work?

Our Infor LX Practice just finished a Supply Chain and Manufacturing audit for one of our customers. During that engagement, several areas of the business were identified that could benefit from additional training and consulting support. 

Areas of significance were:

  • Purchasing
  • Customer Service
  • Billing
  • Inventory
  • Costing
  • Bills of Materials and Routings
  • Material Requirements Planning
  • Shop Floor Control

Several manual procedures and “tribal knowledge” systems were discovered. The evaluation was done by two consultants who spent time with key users during two onsite visits. The next step in the process will involve working with the client to prioritize the list of items identified and develop a strategic plan focused on growth and efficiency.

Previous Article Infor LX & BPCS Tip of the Week: Order processing enhancement – LX 8.4
Next Article How Do I Determine If MES Is Right For My Business?
Print
37263 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories