Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Why should I automate my processes?

LN & Baan

The truth of the matter is that automation is a necessity in order to stay competitive in today’s marketplace. The demand to do more with less is ever present. Automating your processes can give you the competitive advantage you’ve been looking for.

Basic automation tools also help manufacturers track performance, such as cycle times, and order-to-delivery times, so that they can measure improvements. This tracking ability provides a historical record, as well as analytics that can be used to predict future needs. With this information, manufacturers can keep a close eye on trends in production orders, and use them to identify seasonal and customer buying trends and triggers. This insight can be helpful in planning for needed resources—from personnel to raw materials.

Read more > Manufacturing Industry Perspectives - Shop floor automation: A necessity for competitive manufacturing

Contact Kathy Barthelt today to discuss how Crossroads RMC can help you automate your processes and propel your business beyond the competition.

Previous Article Infor LN & Baan Tip of the Week: Inventory aging analysis report
Next Article RMClabel offers significant advantages over other third-party label printing software
Print
28863 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The bubble number is maintained at the component level for each component defined on the Bill of Material. It is an extra user-defined reference number that you can use to re-sequence the maintenance screen display or bills of material listings.

In Infor LX, the system displays the bubble number for the existing child items. Engineering drawings often use a bubble number at the component level on the drawing so that same bubble number can be used on the Bill of Material for a link of the component to the drawing. Alternatively, you may use it simply as a method to sequence the BOM.

Be careful of how you assign the number. It is a good idea to assign the number with a consecutive count by 10 leaving room to allow for component additions to the Bill of Material.

If you setup the “From” and “To” Location fields in the Work Center file, this will determine the locations for material issue transactions and production reporting transactions.

The reporting of the transactions happen through production reporting, JIT600, or using the Shop Floor labor posting, SFC600, or Shop Floor Posting from SFC650.

Remember, any location used in the work center file must first be set up in the location master file. Using an MES solution by-passes the need to key any of the data to Infor LX.

First153154155156157159161162

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories