Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
52966 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

INV810 only deletes the sequence number from the ILI of the item so it is not selected again for counting and does not delete the ICY record.

The ICY Cycle Count sequential history file increases in size with each new cycle count session. Running INV015 will purge all the old ICY records up to the date entered on the set-up screen ‘Enter Cycle Count Ending Date’ field. Physically deleting the old ICY files.

In most cases, when you complete the cycle count posting and run the reports, you can reconcile the data as required. After you reconcile the data for a specific day (or group of days), you can run INV015 to purge the data for that day (or group of days).

It’s almost that time of year – AND with Crossroads RMC and Avalara, you can e-file your 1099s and other forms simply and easily!

If you plan to e-file more than 2,500 forms this year, please let us know and we’ll connect you with our Avalara representative for custom pricing. Otherwise, the link below is completely self-service. Watch the short YouTube video at the bottom of the linked page for a quick walk-through tutorial, and you’ll be ready to get started immediately!   

Learn more> Avalara 1099

First1314151618202122Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories