Manufacturing vs. Finance: Who wins?

Infor LX | BPCS | Infor LN | Baan

Manufacturing Goals: develop high-quality products and services in response to the demands of the market, improve efficiency and maximize capacity utilization.

Finance Goals: analyze revenue growth opportunities, control costs, and maximize profitability.

So, who wins? Whose priorities take precedence when it comes down to it and what happens when the demands seem to compete? The answer to that question may be simpler than you think. Quite often, the production side of the house and the finance side of the house are operating based on their own sets of data which have been created within their respective group to serve the needs of the group alone. Finance likely does not have access to production reports and production hardly ever has access to finance reports. But why? What if both departments operated based on the same data, viewed in the same way? Would it not be easier to understand where the priorities should be and how the ship should be steered?

Dashboards provide real-time visualization of data through graphs, tables, and other visualization techniques. Through the use of dashboards, the complexity of large volumes of data gets stripped away and instead gets presented through manageable, digestible chunks of information so companies can focus their attention on the areas of the business that need it most. The dashboards then serve as a common ground for further dialogue and present information to everyone in a way that is mutually understandable.

Although the data represented in dashboards can be gathered through multiple reports and sometimes multiple reporting systems, consolidating the data into one unified source provides a highly effective tool to generate actionable insight.

Crossroads RMC's Analytics Dashboard provides a pre-built connection to Infor LX / BPCS and Infor LN / Baan and includes a full suite of ready-to-use, standard dashboards that can jump-start collaboration between your finance and production departments.

Learn more about Analytics Dashboard for Infor LX & BPCS> 

Learn more about Analytics Dashboard for Infor LN & Baan> 

See some examples below:

Production Order - Click to Enlarge

Production Order - Click to Enlarge

Labor History Click to Enlarge

Previous Article Beyond the Four Walls—Achieving Upstream and Downstream Inventory Visibility
Next Article Infor LX & BPCS Tip: LX Release 8.4.1 – What’s New?
Print
23188 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

What items should be MPS planned, and what items should be MRP planned?
Master Scheduled Items are those items that are finished goods, or service items, that receive their requirements either specifically from Independent demand, or both Dependent and Independent demand.

  • Independent Demand is demand that cannot be calculated from higher-level demand in the product structure, and therefore must be either a forecast or an actual customer order (Finished Goods or Service parts sold to customers).
  • Dependent demand is derived from higher-level demand in the product structure. Dependent demand includes components, raw materials, and sub-assemblies. (these are not normally Master Scheduled Items).
  • Service Parts may have both independent demand from forecast and/or customer orders, as well as dependent demand from higher-level demand if that item is also used in other sub-assemblies or products.
  • Cumulative Lead Time is a concept used in Master Production Scheduling (MPS) that combines the “fixed” lead time, and the “variable” lead time needed to produce the product. It is the longest path through a given Bill-of-material. Based on the MPS setup options, Infor LX (ERP LX) will calculate the cumulative lead time (also called “the Critical Path”) for you (use the “indented BOM” display in BOM300 and find the item with the longest lead time “L/T”). Note: You may have to use Action 21, Line Detail, to see the “L/T” lead time for each item.
First2324252628303132Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: