3 Essential Tactics to Increase Efficiency on the Manufacturing Floor

From John O'Kelly's article on Manufacturing.net:

"Regardless of industry, efficiency gains and increased speed provide a competitive edge. The ever-increasing competition in the manufacturing world makes it necessary to find new, efficient ways to speed up the process while remaining accurate and productive. While flying robots and miracle technologies may promise to reshape the industry, we still have a way to go until full automation, and thus the most important asset on the manufacturing floor in 2019 will remain its people.

In 2019, the focus will undoubtably be increasing efficiencies, and this can be achieved through investing in employees, equipping them with the proper techniques and tools. An invested labor force will limit mistakes on the manufacturing floor and improve throughput at every level of the process."

Here are a few best practices to increase efficiency on the manufacturing floor in 2019:

  1. Invest in your labor force
  2. Prioritize quality assurance
  3. Improve labeling errors

You can read the full article with detailed descriptions at: https://blog.safe.com/

Optimize Your Manufacturing Today!

Previous Article Ten Manufacturing Technology Predictions for 2019
Next Article Six Steps to Optimized Order Fulfillment
Print
59602 Rate this article:
No rating
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

What items should be MPS planned, and what items should be MRP planned?
Master Scheduled Items are those items that are finished goods, or service items, that receive their requirements either specifically from Independent demand, or both Dependent and Independent demand.

  • Independent Demand is demand that cannot be calculated from higher-level demand in the product structure, and therefore must be either a forecast or an actual customer order (Finished Goods or Service parts sold to customers).
  • Dependent demand is derived from higher-level demand in the product structure. Dependent demand includes components, raw materials, and sub-assemblies. (these are not normally Master Scheduled Items).
  • Service Parts may have both independent demand from forecast and/or customer orders, as well as dependent demand from higher-level demand if that item is also used in other sub-assemblies or products.
  • Cumulative Lead Time is a concept used in Master Production Scheduling (MPS) that combines the “fixed” lead time, and the “variable” lead time needed to produce the product. It is the longest path through a given Bill-of-material. Based on the MPS setup options, Infor LX (ERP LX) will calculate the cumulative lead time (also called “the Critical Path”) for you (use the “indented BOM” display in BOM300 and find the item with the longest lead time “L/T”). Note: You may have to use Action 21, Line Detail, to see the “L/T” lead time for each item.
First2324252628303132Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: