Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC
/ Categories: Partner News, Event / News

Crossroads RMC and Kardex Remstar Partner to Provide Solution for L3 Electron on Infor LN

L3 Electron has selected Crossroads RMC to develop a connector from Kardex Remstar’s Power Pick Global software to Infor LN. Power Pick Global facilitates batch picking, allowing an operator to fill multiple orders at one time, increasing productivity significantly. Multi-user-picking provides the flexibility to easily add additional labor to further increase picking speeds when order volume is high. Optical indicators such as Pick-to-Light and Put-to-Light direct the operator to the exact location of the pick, increasing accuracy and reducing the number of picking errors. L3 Electron is a technology company specializing in the manufacture of microwave devices for ground-based, airborne and satellite communications and radar. Go live is scheduled for late Q3 of 2017.

Previous Article BPCS/LX Tip of the Week: Operational Inefficiencies
Next Article Blueprint for Labeling Success
Print
30050 Rate this article:
3.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

What items should be MPS planned, and what items should be MRP planned?
Master Scheduled Items are those items that are finished goods, or service items, that receive their requirements either specifically from Independent demand, or both Dependent and Independent demand.

  • Independent Demand is demand that cannot be calculated from higher-level demand in the product structure, and therefore must be either a forecast or an actual customer order (Finished Goods or Service parts sold to customers).
  • Dependent demand is derived from higher-level demand in the product structure. Dependent demand includes components, raw materials, and sub-assemblies. (these are not normally Master Scheduled Items).
  • Service Parts may have both independent demand from forecast and/or customer orders, as well as dependent demand from higher-level demand if that item is also used in other sub-assemblies or products.
  • Cumulative Lead Time is a concept used in Master Production Scheduling (MPS) that combines the “fixed” lead time, and the “variable” lead time needed to produce the product. It is the longest path through a given Bill-of-material. Based on the MPS setup options, Infor LX (ERP LX) will calculate the cumulative lead time (also called “the Critical Path”) for you (use the “indented BOM” display in BOM300 and find the item with the longest lead time “L/T”). Note: You may have to use Action 21, Line Detail, to see the “L/T” lead time for each item.
First2324252628303132Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: