Infor LX / BPCS Tip of the Week: Control Date Lead Times in LX

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
Previous Article Partner News: How does Infor LN fit the industries that it serves?
Next Article Why should you look at OTTO? Let’s see what an OTTO customer has to say:
Print
33293 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The Cycle Counting Sub-System Within Inventory Management

The system uses the following information as the basis for cycle counting selection:

  • Cycle Counts/Year: The system calculates the time between cycle counts based on your entry in this Item Master file field for each item (optional).
  • Last Cycle Count Date: This date is in the Location Inventory file, ILI, if you use locations, or in the Warehouse Inventory file, IWI, if you don't.

The system adds the time between cycle counts (calculated as described above) to this date. If the result is less than or equal to today's date, the item is selected for cycle counting. If it is greater than today's date, the item is not selected, it is not due yet for cycle counting.

There is another special condition that causes an item to be selected for cycle counting. If the ILI/IWI record of the item has a Y in the Cycle Flag field, the item is selected automatically. This flag indicates that the item's on-hand balance has gone to a negative value sometime since the last cycle count. That applies even if the value is not negative at selection time. The programs that can set this field are INV500D, INV510, and BIL540.

You can also limit the items selected for counting by specifying limits of the item numbers or warehouses to be searched.

First2526272830323334Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories