Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Anthony Etzel
/ Categories: Event / News

Crossroads Welcomes Ridewell Corporation – MES for Infor LX

Crossroads RMC welcomes Ridewell Corporation as our newest client having selected Crossroads MES (Manufacturing Execution System) for their shop floor automation with integration to Infor LX. 

Ridewell engineers and manufactures air-ride, rubber-ride, steel spring and mechanical suspension systems for the truck, trailer, RV and bus industries. The company has served the transportation industry since 1967 and holds many active patents for exclusive features that provide for low maintenance and superior ride quality.

Ridewell’s objective was to eliminate shop floor paperwork and manual processes, obtain real time performance metrics, and achieve greater visibility over manufacturing operations. After carefully conducting their due diligence they selected Crossroads MES to address these challenges.

Crossroads Manufacturing Execution System connects your manufacturing plant to the rest of your enterprise by using touch screen PCs on the shop floor. Powered by IBM I Power Systems, Crossroads MES fills the gap that exists between your ERP system and your lean manufacturing initiatives by modernizing and transforming the ERP experience. It delivers paperless shop packets to your entire workforce, captures live manufacturing data, and then delivers real-time status to your Tablet or PC.

Key Features include:

  • Paperless Shop Floor                               
  • Labor and Machine Time
  • Production Reporting
  • Material Issue
  • Scrap Reporting
  • Scheduling
  • Capacity Load Balancing
  • Label Integration
  • Dashboard Analytics                    

Crossroads MES provides information that helps manufacturing decision makers understand how current conditions on the plant floor can be optimized to improve production output.

Crossroads RMC is proud to have Ridewell Corporation as a client and we look forward to working together to support their company growth and success.

Previous Article BPCS/LX Tip of the Week: Shelf Life Days and Retest Days
Next Article Baan/LN Tip: Credit Control Parameters (ACR Parameters)
Print
20045 Rate this article:
5.0
Anthony Etzel

Anthony EtzelAnthony Etzel

Other posts by Anthony Etzel

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

First4849505153555657Last

Theme picker

Tips: LN | Baan

Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps...

Operations: To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items...

12345678910Last

Theme picker

Categories