Baan/LN Tip of the Week: Advantages / Disadvantages of Virtualization

I know a lot of our customers are considering virtualization projects. I came across this, and thought it might be useful:

The advantages of virtualization include the following:

• You get more out of your existing resources. Pool common infrastructure resources and break the legacy “one application to one server” model with server consolidation.

• You can reduce datacenter costs by reducing your physical infrastructure and improving your server to admin ratio. Fewer servers and related IT hardware means reduced real estate and reduced power and cooling requirements. With better management tools, you can improve your server to admin ratio so personnel requirements are reduced.

• You can increase the availability of hardware and applications for improved business continuity.

• Securely back up and migrate entire virtual environments with no service interruptions. Eliminate planned downtime and recover immediately from unplanned issues.

 

• Gain operational flexibility. Respond to market changes with dynamic resource management, faster server provisioning, and improved application deployment.

The disadvantages of virtualization include the following:

• Virtualization adds overhead to the CPU, memory, IO, and network.

• Virtualization adds an additional layer to the hardware and software stack. Therefore, additional complexity is introduced in the following circumstances:

  • When sizing the physical server.
  • When planning VM capacity.
  • When planning multiple VMs on the same physical server.
  • When investigating performance issues.

Optimize Your Manufacturing Today!

Previous Article Gaining Flexibility and Agility in the Workforce
Next Article BPCS/LX Tip of the Week: Purchase Order “In Use” Reset Feature 8.3.5
Print
37592 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

First4849505153555657Last

Theme picker

Tips: LN | Baan

Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps...

Operations: To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items...