Infor LX & BPCS: What are your production orders telling you?

Measure what you want to improve.

Six simple words, but put together they convey a powerful concept that can transform manufacturing companies. It’s a basic concept that’s hard to argue with: Collect data, see where the data leads you, and make changes that have a positive impact on the data. Repeat often.

If your company is manufacturing a product, you’re more than likely creating manufacturing variances. These variances tell managers where the company is not performing to the standards that were created and agreed to by those responsible in the Engineering, Finance, or Production Departments. There is almost a 100% chance you are creating either favorable or unfavorable manufacturing variances and, quite frankly, none of the variances will ever be favorable because the company is either over-costing or under-costing the production parts.

The data is all there within your ERP system… or at least it should be… provided that you are not tracking production information outside of your ERP system in a spreadsheet.

Analyzing your production orders can help you track down:

  • Missing labor entries
  • Incorrect labor standards
  • Incorrect time estimates for routing steps
  • Inaccurate or non-existent material issues
  • Work order structures that are not accurate
  • And more

Not sure where to start? Crossroads RMC’s supply chain and manufacturing audit can help identify problem areas in Purchasing, Customer Service, Billing, Inventory, Costing, Bills of Materials and Routings, Material Requirements Planning and Shop Floor Control, and more.

Request a Supply Chain & Manufacturing Audit, or Contact me today to learn more - 800.762.2077

Previous Article How well does your ERP Serve your Materials team?
Next Article What are the biggest struggles manufacturers face with regard to tax compliance?
Print
24981 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

First5253545557596061Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories