Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: Support for IBM i 7.3 and Infor LX Products

On September 30, 2022, IBM® announced the end of support of IBM i operating system 7.3 effective September 30, 2023. In line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024. All Infor LX releases, patches, and related solutions are planned to be delivered and compiled at IBM i 7.4, effective June 1, 2024. These deliverables will install and function on version 7 release 4 (IBM i 7.4) and above. This will require that your operating system is at a minimum release level of IBM i 7.4.

This policy extends to other Infor LX-related technologies including WebTop, System i Workspace (SiW), and Infor Development Framework (IDF).

Action Steps If you have not done so already, we recommend that you start planning and completing your upgrade to IBM i 7.4 or above prior to June 1, 2024. After this date, if you register a support call with Infor Support, and your application still runs on IBM i 7.3 or older, you may be requested to upgrade to a supported version of the IBM i operating system.

In addition, we invite you to log on to Infor Support to view and download important information regarding Infor LX. Knowledge Base (KB) articles have been created to proactively provide you with information regarding this Announcement. ​Please consider clicking on the “Subscribe” feature within each KB article to receive notifications. Once you have subscribed, you will receive notifications when they are updated.

  • View KB article 1397381 | Infor LX Product Bulletins and Announcements
  • View KB article 1947086 | Infor BPCS/LX Product Lifecycle Policy


If you need assistance in planning this project, Crossroads RMC is happy to help you strategize, and create project plans, test plans, 3rd party product due diligence, and cutover assistance. Contact us today to learn more. 800.762.2077  | solutions@crossroadsrmc.com

Previous Article Have You Heard About the Latest & Greatest Way to BOOST Productivity?
Next Article Infor LN & Baan Tip: Serialized Controlled Item >> to >> Non-Serialized Controlled item
Print
13262 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Clients who want to process more than one customer order line, one item, or one shop order are now able to continue processing without having to leave the Multi-Level Backflush screen. After entering data for a specific category, users are now able to use the F18=Accept & Continue function key that allows users to start and complete an action and remain on the MultiLevel Backflush screen, LMP600D1, to perform the next action. Previously, users were sent back out to the SYS500-06 screen after processing using single customer order line, shop order, or item.

This enhancement includes these programs or areas:

  • Lean Production Back-flush Selection Panel, LMP600D  
  • Lean Production Back-flush Selection Panel, LMP600FM
  • Lean Production Back-flush Selection Panel, LMP600HT

EGLi users who maintain journal entries in a Microsoft Excel spreadsheet can use this utility to upload journal entries to EGLi. The Journal Upload installation program adds an Add-Ins tab to Microsoft Excel. This tab includes options to connect to the server where EGLi is installed and to open a spreadsheet template to use for manual journal entry. When the spreadsheet is complete, the Add-Ins tab is used to upload the spreadsheet.

To install Journal Upload:

  1.  The Power-Link Installation page has links to the Client installation programs and a link to download and install the Journal Upload utility. To access this page, use this link with your own values for system and NetLinkport: http://system:NetLinkport/Installs/ClientInstall/Install.html  where system is the server where IDF is installed and NetLinkport is the Net-Link port, typically 36001
     
  2. On the Power-Link Installation page, click the link provided to download and install EGLi Journal Upload.
     
  3. Follow the screen prompts to complete the installation on your PC.
     
  4. To verify the installation, open an Excel spreadsheet. Confirm that the Add-Ins tab is on the spreadsheet. 


See the Infor Enterprise General Ledger for System i Journal Upload Installation and Infor LX Configuration Guide.

First5253545557596061Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories