Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

Manufacturing: How much time are you wasting on manual processes?

It tells us that there is a great need for a review of your manufacturing processes.

Manual processes around labor reporting, production completions, issuing of material, inspection approvals, serialization, and more can weigh down the entire shop floor team and can be the source of significant errors. Your business and your customers’ needs have changed and you are in a constant battle to keep up. It is hard to know which area to tackle first and where the greatest impact can be made.

That's where the Crossroads RMC Manufacturing Utilization Review comes in. Whether you're on an old version of BPCS or Baan, or the latest version of Infor LX or Infor LN, odds are there are aspects of Manufacturing / Production Control in the ERP system that doesn't fit your business's current strategy. Do you throw out the software and start with something new? Odds are that is overkill. Sometimes it just boils down to taking the time to understand how your current state matches up with your corporate strategy, understanding the gaps, and developing a plan to get you from point A to point B.

We have successfully helped companies transform their business in the areas of: 

  • Planning / Scheduling
  • Shop Floor Control
  • Final Assembly
  • Quality Control
  • Production Control
  • Forecasting
  • Work Centers / Routings / Bill of Materials

Our consultants have 30+ years of experience that bring about REAL change. We work at your pace and in a way that makes the most sense to your business. Our consultants can review current usage and related business processes of your entire ERP system, or a particular area like Manufacturing / Production Control, and make recommendations that will reinvigorate your ERP system and those that use it.

A utilization review can be performed 100% remotely via phone or web meeting, or in person, following safety guidelines.

Get started > with a FREE 1-hour phone assessment to determine if your business can benefit from a Manufacturing Utilization review!

Sources: McKinsey.com & productionmachining.com

Previous Article The Best Baan IV | Baan V | Infor LN Financial Reports to Analyze Company Performance
Next Article The Best BPCS | Infor LX Manufacturing Reports to Analyze Company Performance
Print
27261 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

This enhancement provides the ability to copy order lines, quote lines, and RMA lines. During Order Entry, action 3=Copy is available to copy regular lines and special lines. The new line displays in the next available line number.  This enhancement reduces manual key entry and speeds up Order Entry. 

The programs or areas impacted include ORD700D2, Order Line Entry, Quote Line Entry, and RMA Line Entry.

This enhancement prevents over-allocations and resulting overshipments to customers. Attempted over-shipments can present an error message to the user, or there is an option to automatically adjust the user’s request to the allowed quantity.

Since over-shipments result from over-allocations, Infor LX provides an optional validation during the four processes where a user can attempt to over-allocate. Note: Infor LX never over-allocates or over-ships; this always results from a user’s action. This enhancement provides three options regarding over-allocations and over-shipments:

  • Continue current process with warning message.
  • Show error message.
  • Automatically change allocation quantity to match quantity available for shipment.

If the over-ship quantity change is acceptable, internal procedures may require that the order quantity be revised so that pricing, promotions, credit checking, load planning, and other processes reflect the actual quantity.

The programs or areas impacted include:

  • ORD820D, Order Entry System Parameters
  • ORD720D2, Order Allocations
  • ORD725D, Order Entry Allocations
  • ORD570D5, Pick Confirm Inventory Confirmation
  • ORD700D2 / ORD700DA / ORD710B, Order Line Validation
First5556575860626364Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories