Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt
/ Categories: Infor LN & Baan Tips

Baan/LN Tip of the Week: Default Order Frequency

In Baan IV, requirements for an MPS item with the order method lot-for-lot result in daily planned MPS orders.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, an MPS planning run generates one planned MPS order of 200 pieces for each working day in the plan period.

In Infor LN, requirements for a planned item with the order method lot-for-lot result in one planned order per plan period.

For example, if a plan period contains 10 working days and the net requirements for an item in that period is 2000 pieces, a master planning run will generate a single planned order of 2000 pieces for the first working day in that plan period. To influence the order quantity of the planned orders, enter appropriate values in the Maximum Order Quantity field and the Order Interval field in the Items – Ordering (tcibd2500m000) session or choose a fixed order quantity.

Previous Article 15 Myths About Warehouse Automation
Next Article BPCS/LX Tip of the Week: Establish Costing For Purchased Items
Print
46339 Rate this article:
No rating
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

This enhancement provides the ability to copy order lines, quote lines, and RMA lines. During Order Entry, action 3=Copy is available to copy regular lines and special lines. The new line displays in the next available line number.  This enhancement reduces manual key entry and speeds up Order Entry. 

The programs or areas impacted include ORD700D2, Order Line Entry, Quote Line Entry, and RMA Line Entry.

This enhancement prevents over-allocations and resulting overshipments to customers. Attempted over-shipments can present an error message to the user, or there is an option to automatically adjust the user’s request to the allowed quantity.

Since over-shipments result from over-allocations, Infor LX provides an optional validation during the four processes where a user can attempt to over-allocate. Note: Infor LX never over-allocates or over-ships; this always results from a user’s action. This enhancement provides three options regarding over-allocations and over-shipments:

  • Continue current process with warning message.
  • Show error message.
  • Automatically change allocation quantity to match quantity available for shipment.

If the over-ship quantity change is acceptable, internal procedures may require that the order quantity be revised so that pricing, promotions, credit checking, load planning, and other processes reflect the actual quantity.

The programs or areas impacted include:

  • ORD820D, Order Entry System Parameters
  • ORD720D2, Order Allocations
  • ORD725D, Order Entry Allocations
  • ORD570D5, Pick Confirm Inventory Confirmation
  • ORD700D2 / ORD700DA / ORD710B, Order Line Validation
First5556575860626364Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories