Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
52966 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Restrict Over-shipments to Customers

  • System parameter option controls when over shipments are allowed

Options to:

  • Continue current process with warning message
  • Give error message
  • Automatically correct to quantity available for shipment
     
  • Option to revise the order quantity so that pricing, promotions, credit checking load planning and other processes reflect the actual quantity
  • Allows better control of exceptions for over shipments
  • Ensures that pricing, promotions are correctly based on actual order quantity

Graphical representation makes complex concepts—like the intricacies of an ERP system—more universal, relatable and easy to understand.

ERP dashboards gather and visualize critical metrics from across the organization, offering insight into the performance, outlook and interconnectivity of business processes.

By setting up ERP dashboards that illustrate key metrics and compellingly communicate operational performance, key stakeholders will have a clear picture of the health of the business—and make better, more informed business decisions as a result.

The Crossroads Analytics Dashboard has preconfigured views for all of the following:

 Infor LX & BPCS
  • Sales Bookings (ECH)
  • Accounts Receivable (RAR)
  • Accounts Payable (APH)
  • Planned Orders (KFP)
  • Purchasing (HPH)
  • Shop Order Material (FMA)
  • Shop Order Operations (FOD)
  • CEA
  • Order Booking (ECS)
  • Labor History (FLT)
  • Sales History (SIH)
  • Material Status (IIM/ILI)

To learn more visit our Analytic Dashboard webpage.

First5657585961636465Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

1345678910Last

Theme picker

Categories