Infor LN & Baan: What are your production orders telling you?

Measure what you want to improve.

Six simple words, but put together they convey a powerful concept that can transform manufacturing companies. It’s a basic concept that’s hard to argue with: Collect data, see where the data leads you, and make changes that have a positive impact on the data. Repeat often.

If your company is manufacturing a product, you’re more than likely creating manufacturing variances. These variances tell managers where the company is not performing to the standards that were created and agreed to by those responsible in the Engineering, Finance, or Production Departments. There is almost a 100% chance you are creating either favorable or unfavorable manufacturing variances and, quite frankly, none of the variances will ever be favorable because the company is either over-costing or under-costing the production parts.

The data is all there within your ERP system… or at least it should be… provided that you are not tracking production information outside of your ERP system in a spreadsheet.

Analyzing your production orders can help you track down:

  • Missing labor entries
  • Incorrect labor standards
  • Incorrect time estimates for routing steps
  • Inaccurate or non-existent material issues
  • Work order structures that are not accurate
  • And more


Crossroads also offers a Production Order Variance Report package for Baan and Infor LN which quickly identifies problems with pricing, materials, efficiency, and rejects. learn more> 

Not sure where to start? Crossroads RMC’s supply chain and manufacturing audit can help identify problem areas in Purchasing, Customer Service, Billing, Inventory, Costing, Bills of Materials and Routings, Material Requirements Planning and Shop Floor Control, and more.

Request a Supply Chain & Manufacturing Audit, or Contact me today to learn more - 800.762.2077

Previous Article Infor LN & Baan Tip: MPS planned vs. MRP planned
Next Article Infor LX & BPCS Finance Tip: Items without costs, CST101D
Print
24495 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
First5859606163656667Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories