Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Top 10 Things You Might Not Know About Crossroads RMC

  1. Crossroads RMC has been in business since 1984 & has been an  partner since 1991. 
     
  2. Crossroads RMC offers functional & technical training on all versions of Infor LX, BPCS, Infor LN, and Baan and will completely tailor the training to your specific needs. 
     
  3. Many of our consultants are 🎵 musically inclined, so you might have the added benefit of some entertainment while your ERP problems are being solved!
     
  4. Our consultants have expert level functional & technical knowledge of every version of Infor LN & Baan from Triton 2.X through LN 10.7., and Infor LX & BPCS from BPCS 3.0 to LX 8.4!  💡
     
  5. Crossroads RMC is a value-added reseller of data collection equipment (mobile computers, printers, RFID equipment, and more).
     
  6. Our headquarters are just outside of Chicago, but for some silly reason, our East Coast staff thinks they have the best pizza.🍕
     
  7. Our integration specialists have developed close to 50 different integrations to Infor LN, Baan, Infor LX & BPCS.
     
  8. Crossroads RMC offers 24 X 7 support to all of our customers. 💪
     
  9. Our technical consultants have developed many Infor ERP software add-on solutions like MES, Data Collection, an Analytics Dashboard, FedEx / UPS integration, and more that are used by thousands of Infor users every day.
     
  10. We’ve been publishing Infor LN, Infor LX, BPCS, and Baan tips & tricks since February 2010, and most are still available on our website, with new ones being added every other week!

Previous Article Infor LX & BPCS Tip: PowerLink
Next Article Infor LX & BPCS Tip: Drop Shipments
Print
24649 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
First5859606163656667Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories