Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: Inventory Stocking Levels – Warehouses, Locations and Lots…Oh My!

The Infor LX system supports 4 levels of inventory. You can view summaries of stock at each level through the Material Status Inquiry program or through reports. Below are the 4 levels:

  • Item
  • Item + warehouse
  • Item + warehouse + location
  • Item + warehouse + location + lot

The lot number level and/or container of inventory can cross multiple warehouses and locations, for example, item + lot or item + lot + container. Locations exist within warehouses. There is no limit on the number of warehouses, locations, or lots that you can assign to an item.

Multiple Warehouses
You can assign as many warehouses as needed for any item. You can designate each warehouse as allocatable, allowed for order processing, or non-MRP, not used in the MRP netting logic. This allows your business to set up staging areas and quarantined warehouses. The warehouses can be physical or logical warehouses.

Multiple Locations
You can assign as many inventory locations as needed for any item. The location number is six characters long. This allows you to define sub-locations within a location, which can be an aisle, bin, or row.

The system stores item-warehouse combination inventory and allocation data. Optionally, sales history is available by item and warehouse in sales by units for the past twelve months. Total monetary amounts of sales by warehouse are also available in year-to-date, the last twelve months individually, and previous year-to-date.

Lot Inventory
On an item-by-item basis, the system requires the input of and performs tracking of lot numbers by inventory transaction. The system supports forward and backward lot traceability. The system provides inquiries and reports for the stock, allocation, and movement of inventory by lot. The system also automatically supports shelf life, expiration date, and reject data for each lot. The system automatically uses the expiration date in this allocation logic and MRP logic.

Previous Article Need Knowledgeable ERP Staff Quickly?
Next Article Tim Baker – Infor LX User Group’s Newest Board Member!
Print
15987 Rate this article:
4.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
First5859606163656667Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories