Infor LN & Baan Job Management

Baan IV, Baan V, Infor LN

You can use job management to schedule jobs based on your organizational requirements. For example, you can schedule jobs at non-peak hours to improve the overall system performance in a heavily loaded environment. A job consists of one or more sessions or shell commands, or both, that run without user interaction. The sessions and shell commands in a job can be started while you are not logged on to the ERP system. You can schedule jobs to start processes periodically, at a defined interval, or immediately. Typically, you use job management for print and processing sessions.

Job data  - To create a job, you must specify basic job data and link sessions or shell commands, or both, to the job. In the basic job data, you specify whether the job is periodical. For periodical jobs, you specify how the job will be scheduled.

Shared job data tables  - Typically, each company stores its own basic job data. As a result, a job runs for a particular company. However, in a job, you can also run sessions in more than one company. You can run sessions in multiple companies when the job data tables of the associated companies are physically mapped to a single main company.

Job execution - Jobs can be started in multiple ways. The job’s status defines how you can start the job. You can start the job if the job’s status is In Queue or Free.

Job history -  When the execution of a job stops, for example, when the job completes successfully or when a runtime error occurs, information is written to a history log. The job history contains information, such as the date and time of the execution and the reasons why the job and its associated session ended.

Job Management - Baan IV

Job Management - Baan V

Job Management - Infor LN

Previous Article Infor LN & Baan Tip: Barcodes for Any Baan and Infor LN  Report – Did you know?
Next Article Infor LX & BPCS Tip: Can’t Select Orders for Pick Release or Pick Confirm?
Print
12737 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
First5859606163656667Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories