Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: System i Workspace AnyWhere information and Important Support Dates for IBM and Microsoft Products

System i Workspace AnyWhere is a web application framework that provides a common user interface for Infor’s IBM i products.

*** We strongly recommend that you subscribe to this KB to receive automatic notification when it is updated ***

Latest Updates
System i Workspace AnyWhere - Feature Pack 22 is now available - see the Update History section below (as of January 4, 2024)

  • Tomcat 9.0.80 Upgrade Installer Released - see the Update History section below (October 9, 2023)
  • Installer Hotfixes - affects both Silver Copy and Tomcat Upgrade Installers (August 17, 2023)
  • Removed Support for Microsoft Windows 8.1 (January 11, 2023)
  • System i Workspace AnyWhere - Silver Copy Build 220930 FP17 (Microsoft Windows 2016/2019/2022 Server - Tomcat 9) has been released (October 6, 2022)
  • System i Workspace AnyWhere - Silver Copy Build 220930 FP17 (IBM i OS/400 - WebSphere Application Server 9) has been released (October 6, 2022)
  • Added support for IBM OS/400 V7R5 (October 6, 2022)
  • Removed Support for Internet Explorer (January 11, 2022)
  • Removed Support for the System i Emulator and Update Manager (January 11, 2022)
  • Removed support for IBM OS/400 V7R2 (July 16, 2021)
  • Removed support for Mozilla Firefox web browser (March 30, 2021)
  • Added support for Microsoft Windows Server 2019 (May 18, 2020)
  • Added support for IBM OS/400 V7R4 (November 28, 2019)

Documentation

  • System i Workspace AnyWhere - Installation & Admin Guide (December 15, 2023)
  • System i Workspace AnyWhere - FAQ (December 4, 2023)
  • System i Workspace AnyWhere - Feature Pack Release Summary (December 4, 2023)
  • System i Workspace AnyWhere - Product Guide (August 30, 2023)
  • System i Workspace AnyWhere - InforOS Integration Guide for System21 (August 31, 2023)
  • System i Workspace AnyWhere - Quick Install Guide (September 13, 2022)
  • System i Workspace AnyWhere (IBM i) - Quick Install Guide (August 25, 2022)
  • System i Workspace AnyWhere - Release Summary (March 3, 2023)
  • System i Workspace AnyWhere - SSO MustGather & Troubleshooting (March 3, 2023)
  • System i Workspace AnyWhere - Load Balancing Guide (August 31, 2023)
  • System i Workspace AnyWhere - 5250 AnyWhere Emulator Designer Guide (December 4, 2023)
  • System i Workspace AnyWhere - 5250 AnyWhere Emulator Extensions Guide (June 6, 2023)
  • System i Workspace AnyWhere - Drillback Guide (August 31, 2023)

 

Release Notes

Withdrawal of support for legacy Operating Systems and Products from IBM and Microsoft

Support for the following Operating Systems with System i Workspace AnyWhere has now been withdrawn...

  • IBM OS/400 V7R2 (support ended by IBM on 04/30/2021)
  • Microsoft Windows 8.1 (extended support ended by Microsoft on 10/01/2023)

The System i Workspace AnyWhere documentation has been updated to reflect the removal of support for these Operating Systems.

Advance Notice of 3rd party vendor end-of-life (EOL) dates:

  • Microsoft's retirement date for Windows 10 is 10/14/2025
  • Microsoft's extended support for Windows Server 2016 will end on 12/01/2027
  • IBM's standard program support for IBM i 7.3 ended on 09/30/2023 (extended support available until 09/30/2026)  

Note: An official statement from Infor in relation to our support will be made nearer the EOL date of each product.

Previous Article Infor LX / BPCS & Infor LN / Baan Tip: Time for the Notorious TRIO: Manual -  Physical -  Inventory
Next Article Avoid Being a Quitter: How Crossroads RMC Can Help You Achieve Your Goals
Print
10627 Rate this article:
2.5
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

EGLi provides Infor LX Configurable Enterprise Accounting (CEA) functionality including Advanced Transaction Processing (ATP), a configurable ledger, and batch transaction processing in the IDF architecture.

EGLi is a complete replacement for CEA. Infor LX applications integrate with EGLi, and subsystem transactions generated in Infor LX are used to create journal entries in EGLi. The Infor LX integration system parameters allow you to specify whether CEA or EGLi is your primary financial product.

We recommend that you select CEA while you test the integration. The primary financial product flag and the CEA migration programs are designed to assist existing CEA clients with their implementation of EGLi. Journals are produced in both GL systems so you can verify that the data in both GL systems are the same. This integration includes migration programs that copy your existing CEA files to corresponding EGLi files. After you run the migration programs, EGLi should be configured and ready to use. If you are already running IDF via Ming.le or SiW, before you install EGLi, you will need to see the Ming.le integration guide for instructions on how to export EGLi tasks from IDF to SiW/Ming.le.

Learn More > Infor LX Integration Guide for Enterprise General Ledger

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
First5859606163656667Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories