Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Kathy Barthelt

Infor LN & Baan Tip of the Week: Dynamic Assembly Control BOM (LN 10.7)

In previous releases of LN, the Assembly Control Bill of Material (BOM) offered limited flexibility. For each end item configuration, users were required to create unique Engineering Modules, which are used to determine the assembly parts that are consumed in a specific Line Station during a specific operation.

If LN is integrated with Design Studio, previously called Infor CPQ, BOM structures can be maintained in Design Studio for Assembly Control. These structures can include non-configurable parts that are directly linked to configurable items. When communicating these structures to LN using the Assembly Control, Product Variant Structure (tiapl3510m000) session, the structures were rejected because non-configurable parts were not supported by the session logic.

In this release, BOM structures that include non-configurable parts can now be accepted in LN. Consequently, if LN is integrated with Design Studio, it is no longer required to use the Engineering Module. Using the Engineering Module has become optional.

Previous Article Infor LX & BPCS Tip of the Week: Multi-Level Backflush (LX 8.4)
Next Article Tip of the Week: 8 Ways to Improve Production Efficiency in Your Manufacturing Plant
Print
52847 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

If it is necessary to pause sending and receiving of BOD messages on your IBM i during your month end process, it is best practice for the document flows that point to the IBM i to guarantee delivery of BOD messages. Once the month end process has been completed, you will need to Resume the ‘Receiving’ and ‘Sending’ Active Connection Points so your documents will continue to process.

Pausing Sending messages

To pause sending messages to ION:

  1. Select Connect > Active Connection Points.
  2. Select the connection point that must be paused for sending messages.
  3. In the Sending Paused column, click Pause. The page is automatically refreshed and the Sending Paused checkbox is selected. A Resume button becomes available. 

Sending of messages by this connection point is stopped....

The database in LX 8.4 has undergone a significant change from previous versions. The database has been created using SQL DDL language instead of the old DDS language. The newer format allows for LX to take better advantage of advances in IBM database technologies as they move forward. Additionally, LX will be better able to make changes to tables (aka files) in the future without causing very large MR explosions to replace all programs that use a specific table. To ease the impact of this significant change, the LX tables (aka physical files) have new names that are the same as the previous version file names but with a “P” at the end, for example IIM is now IIMP. The old file names now belong to SQL views that looks just like the tables. This change made it easier to upgrade all the LX programs without changing every reference to every file. Many of the logical files remain although some have been replaced by SQL indexes to improve performance.

First6465666769717273Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories