Infor LX & BPCS Manufacturing Tip of the Week: Backward Scheduling

Operations are automatically backward scheduled at shop order release time. The backward scheduling algorithm starts with the shop order due date and schedules each operation based upon the standard move and queue times in the routings and the number of days the job is expected to run at standard. The system calculates and stores the operation scheduled start date. The dates may be modified by the shop order maintenance program. The number of days that a job is expected to run an operation is dependent upon the available capacity for that work center and the total hours scheduled for that operation.

The backward scheduling algorithm also considers the shop calendar for weekends, shutdowns, holidays, and partial days.

Backward Scheduling Process

The algorithm starts with the due date of the shop order or planned order. The system makes the following calculations for each operation in the reverse sequence:

  1. The number of move days is subtracted from the due date (or initial date of the previous operation) to get the due date for this operation. The move days are only used on valid shop calendar days.
  2. The system uses the following calculation for the number of clock hours for the operation: Standard run or machine hrs/No. of operators + setup hours
  3. The number of clock hours is spread over the available daily capacity of the work center for those given days. The system uses the following calculation for the daily capacity of the work center: Number of shifts x hours per shift x average efficiency/100
  4. Each day is checked against the shop calendar; the calculation bypasses inactive days or adjusts for any changes in the work center capacity for that day.
  5. Queue time days are subtracted in the same manner as move time days. The resulting date is the operation start date.

The algorithm then goes to the previous operation. When all operations have been included, the resulting date is the scheduled start date of the shop order. Note that MRP uses the item lead time to determine material requirement dates on planned orders.

Previous Article It's almost the end of the 1st Quarter of 2021 -  How are you doing on your 2021 goals?
Next Article Infor LX & BPCS Tip of the Week: Credit Card Processing Within LX
Print
20197 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

If it is necessary to pause sending and receiving of BOD messages on your IBM i during your month end process, it is best practice for the document flows that point to the IBM i to guarantee delivery of BOD messages. Once the month end process has been completed, you will need to Resume the ‘Receiving’ and ‘Sending’ Active Connection Points so your documents will continue to process.

Pausing Sending messages

To pause sending messages to ION:

  1. Select Connect > Active Connection Points.
  2. Select the connection point that must be paused for sending messages.
  3. In the Sending Paused column, click Pause. The page is automatically refreshed and the Sending Paused checkbox is selected. A Resume button becomes available. 

Sending of messages by this connection point is stopped....

The database in LX 8.4 has undergone a significant change from previous versions. The database has been created using SQL DDL language instead of the old DDS language. The newer format allows for LX to take better advantage of advances in IBM database technologies as they move forward. Additionally, LX will be better able to make changes to tables (aka files) in the future without causing very large MR explosions to replace all programs that use a specific table. To ease the impact of this significant change, the LX tables (aka physical files) have new names that are the same as the previous version file names but with a “P” at the end, for example IIM is now IIMP. The old file names now belong to SQL views that looks just like the tables. This change made it easier to upgrade all the LX programs without changing every reference to every file. Many of the logical files remain although some have been replaced by SQL indexes to improve performance.

First6465666769717273Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: