Infor LX / BPCS Tip of the Week: Control Date Lead Times in LX

  • Control Date Lead Times – LX provides five separate Control Date Lead Time fields so you can specify additional lead time values for Shop Orders, Purchase Orders and Planned and Firm Planned orders. Each Control Lead Time Date represents additional time (days) required at each step in the process that needs more time (Quarantine, Stabilize), that is to say, when a component is due, and when it can be used. (working with an aerospace  precision bearing manufacturer, I had to account for the QA requirement that no measurements could be taken until the parts had been “soaked” (stored) in an atmospheric controlled environment (72 degrees, and controlled humidity) for 24 hours. This requirement added one full day of lead time between each machining operation) The MPS/MRP Generation program, as well as programs that Shop Order Material Allocation records use the five control date lead times to adjust component required dates to function in the same way as the BOM Offset Lead Time.
     
  • All programs that create MRP Planned Orders, MRP Firm Planned Orders, Shop Orders, and Purchase Orders call the Control Date Calculation program (MRP515B) to establish all five control dates. A Control Lead Time Date is used to adjust the component Required Dates data in the Material Requirements file (KMR), based on planned orders for a parent, and the FMA Required Dates data, based on shop order release dates for a parent.
Previous Article Partner News: How does Infor LN fit the industries that it serves?
Next Article Why should you look at OTTO? Let’s see what an OTTO customer has to say:
Print
31147 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

This enhancement simplifies access to LX programs that are available through System i Manager (SiM), as well as Workflow for System I (WFi). This provides an easy way to promote common WFi business processes from one LX environment (for example, test or environment) to another LX environment (for example, production). 

LX also provides a set of four-character task codes that can be used within SiM, System i Workspace (SiW), and WFi, for default programs in LX. These predefined LX task codes begin with 0,1,2,3, or 4. Users can specify task codes for their custom programs that are flagged as valid menu options in LX, but these task codes cannot begin with 0,1,2,3, or 4. Users can specify the task codes in Infor LX Object Master Maintenance, SYS625D. This enhancement provides simplified access to LX programs that are flagged as valid menu options in System i Manager and Workflow for System i environments. In SYS625D, The user can also specify task codes in SYS625D for customized programs that are flagged as valid menu options.

Users are no longer limited to backing up or saving files to a tape or diskette.They can now use a Save File (SAVF) to save data and objects. LX programs that perform saves and/or backups were modernized to add a new SAVF option.  

There were numerous places in LX where users are prompted to save a file or library. These screens have options for tape or diskette. Diskette refers to the old 8” diskettes used on System/38. These devices are outdated and virtually obsolete. The current means of saving objects on the IBM i, is through the use of a Save File (SAVF). This compresses the data into a single object that can be saved and is easily transferred between systems.

These objects were modified and/or created for this enhancement:

  • Backup Simulation (FOR630C, FOR630D, FOR630FM, FOR640HT, and FOR630HT)
  • Month End Close (INV903D, INV903FM, INV901C, and INV903HT)
  • Purge YTH/Restore Archived Lots (INV912C, INV912D, INV912DHT, and INV912FM)
  • Purge and Save ITH records (INV932C, INV932D, INV932FM, and INV932HT)
  • Labor Ticket Save (SFC905D, SFC905FM, SFC901C, and SFC905HT)
  • Backup Infor LX Files (SYS700C, SYS700D, SYS700FM, and SYS700HT)
  • Backup Infor LX Programs (SYS710C, SYS710D, SYS710FM, and SYS710HT)
  • Backup Infor LX Source (SYS740C, SYS740D, SYS740FM, and SYS740HT)
  • Save File Name Selection (SYS912D, SYS912FM, and SYS912HT)


Benefit

Use the Backup Simulation to copy a simulation file to a SAVF or tape. Users may want to do this to transfer simulation data from one system to another, from site to site, or to save the data before permanently deleting it from the system.

First6566676870727374Last

Theme picker

Tips: LN | Baan

Table Timestamp Definitions (ttadv4136m000)

Use this session to define timestamps for Infor LN tables. A timestamp is an additional column that stores the date and time of the last change for each record.

Timestamps are utilized by features like the extraction logic of CPM Enterprise Analytics. They enable CPM to perform incremental data extractions. For example, CPM can use the timestamps to extract records that were changed during the last week in a weekly extraction process.

To Create Timestamps...

Operations: To absorb the cost of cost items into specific projects, you'll need to handle them as customized items. However, cost items cannot directly be defined as customized items. Customized items must be physical, either manufactured or purchased.

That said, it's still possible to absorb cost items into a project, although indirectly. Here's how:

  1. Set Up Ledger Account: First, create a new ledger account in session tfgld0508m000 and set the type to "PCS" (project) in the operations management integrations. This account will be used for matching and approving purchase orders for cost items.

  2. Create and Activate Projects: Ensure that the necessary projects are created and set to active status.

  3. Purchasing Cost Items...