Infor LN & Baan Manufacturing Tip: All About Routings

The planning data for the method of manufacturing is defined in Routing. A routing consists of operations, with each operation identifying the last to be carried out in a work center and/or on a certain machine defined for a specific site.

Routings can be as follows:

  • Standard Routing - A generic routing that can be attached to multiple items
  • Item specific - A routing that is applied to one item
  • Network routing - A routing containing sequentially ordered operations and parallel operations
  • Order quantity dependent routing - A routing that is defined for a specific quantity of items

You use the Routing module to record routings for manufactured items. You can define the following:

â–ª Work centers - A work center is where production activities are performed. Resources, such as people and machines, are linked to a work center. A work center is a group of resource units used as a functional planning unit. The operation rate code, which is linked to the work center, is used to calculate the standard cost of an item or the estimated and actual costs. The capacity load on a work center is used in the planning of production. Work centers can be part of enterprise units used for multi-company modeling purposes.

â–ª Machines - Machines are linked to work centers and are used to plan operations. The rate defined for a machine is used to calculate the actual machine costs. The capacity load on a machine is used for production planning.

â–ª Reference operations - Classified according to the nature of the work performed, reference operations are used to describe activities that take place in the job shop. Reference operations are linked to operation rate codes, which are used to calculate the standard cost of an item or the estimated and actual costs. Reference operations are used in production planning.

â–ª Operations - The operation data for standard and customized manufactured items is maintained with operations. Operation data is stored and maintained for standard items and customized items. A series of operations are performed to manufacture an item. The sequence of operations is defined as a routing in operations. Yield and scrap are defined per operation.

â–ª Norm times - The run time and production rate of an operation are determined using norm tables. After a matrix is defined for two physical characteristics, such as length and width you can maintain a set of standard operation times for the X-Y coordinates. When tasks and routings are defined, the run time and production rate can be calculated by using a norm table.

â–ª Skills - Certain skills may be mandatory to perform a specific operation. To ensure employees assigned to an operation possess the necessary knowledge, skills are linked to both employees and operations.

Previous Article Infor LX & BPCS Manufacturing Tip: Backward Scheduling
Next Article Infor LN & Baan Finance Tip: What Can You Do in the Financial Statements Module?
Print
24843 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

This enhancement simplifies access to LX programs that are available through System i Manager (SiM), as well as Workflow for System I (WFi). This provides an easy way to promote common WFi business processes from one LX environment (for example, test or environment) to another LX environment (for example, production). 

LX also provides a set of four-character task codes that can be used within SiM, System i Workspace (SiW), and WFi, for default programs in LX. These predefined LX task codes begin with 0,1,2,3, or 4. Users can specify task codes for their custom programs that are flagged as valid menu options in LX, but these task codes cannot begin with 0,1,2,3, or 4. Users can specify the task codes in Infor LX Object Master Maintenance, SYS625D. This enhancement provides simplified access to LX programs that are flagged as valid menu options in System i Manager and Workflow for System i environments. In SYS625D, The user can also specify task codes in SYS625D for customized programs that are flagged as valid menu options.

Users are no longer limited to backing up or saving files to a tape or diskette.They can now use a Save File (SAVF) to save data and objects. LX programs that perform saves and/or backups were modernized to add a new SAVF option.  

There were numerous places in LX where users are prompted to save a file or library. These screens have options for tape or diskette. Diskette refers to the old 8” diskettes used on System/38. These devices are outdated and virtually obsolete. The current means of saving objects on the IBM i, is through the use of a Save File (SAVF). This compresses the data into a single object that can be saved and is easily transferred between systems.

These objects were modified and/or created for this enhancement:

  • Backup Simulation (FOR630C, FOR630D, FOR630FM, FOR640HT, and FOR630HT)
  • Month End Close (INV903D, INV903FM, INV901C, and INV903HT)
  • Purge YTH/Restore Archived Lots (INV912C, INV912D, INV912DHT, and INV912FM)
  • Purge and Save ITH records (INV932C, INV932D, INV932FM, and INV932HT)
  • Labor Ticket Save (SFC905D, SFC905FM, SFC901C, and SFC905HT)
  • Backup Infor LX Files (SYS700C, SYS700D, SYS700FM, and SYS700HT)
  • Backup Infor LX Programs (SYS710C, SYS710D, SYS710FM, and SYS710HT)
  • Backup Infor LX Source (SYS740C, SYS740D, SYS740FM, and SYS740HT)
  • Save File Name Selection (SYS912D, SYS912FM, and SYS912HT)


Benefit

Use the Backup Simulation to copy a simulation file to a SAVF or tape. Users may want to do this to transfer simulation data from one system to another, from site to site, or to save the data before permanently deleting it from the system.

First6970717274767778Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: