The Best Baan | Infor LN Manufacturing Reports to Analyze Company Performance

You know what ERP data you need to analyze your company’s production health, but sometimes it is a struggle to get that data in a format that is meaningful. Here are some reports in Baan & Infor LN which you may find useful.

As is the case with most ERP reports, with each version progression from the earliest versions of Baan to the latest version of Infor LN, there are improvements in selection criteria and report content. Some may require some setup and others may require some formatting if you would like to export them to Excel. Contact me if you have questions or need assistance.

BAAN & LN MANUFACTURING:

Baan IV

  • Print Actual Cost by Production Order ticst0401m000
    • This report can be run at any time in the production order’s life to show how hours-spent and material-used compare between estimated and actual usage.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Baan V

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Print Work Center Utilization By Week tiscf1402m000
    • This report shows capacity issues at work centers/machines which help identify production bottlenecks.


Infor LN

  • Print Estimated vs Actual Material Costs ticst0401m000
    • This report can be run at any time in the production order’s life to show how actual material-used compares to estimated usage.
       
  • Print Estimated vs Actual Hour Costs ticst0402m000
    • This report can be run at any time in the production order’s life to show how actual hours-spent compares estimated hours.
       
  • Utilization report from– Print Resource Order Plan cprrp0430m000
    • This report from Enterprise Planning will show all orders from planning and production. By incorporating both order types, capacity issues can be seen short range where planning has determined that new orders are needed, as well as long range where planners may find opportunities to shift work or even to plan machine maintenance.

Previous Article The Best BPCS | Infor LX Manufacturing Reports to Analyze Company Performance
Next Article Infor LX & BPCS Tip of the Week: Reports to Analyze Company Performance
Print
30743 Rate this article:
5.0
Kathy Barthelt

Kathy BartheltKathy Barthelt

Other posts by Kathy Barthelt

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

The Enterprise Item application in the Infor Development Framework for Infor LX supports display of all information relevant to an item. This includes numerous aspects of Inventory, including facility, warehouse, location, lot, and container data.

With the Enterprise Items application, you can customize the data displayed to include more or less data than is currently displayed using the standard Infor LX programs. You can access this information through a single point of entry, so there is no need to switch from one program to another to see all the data you require. This ability to customize will help streamline your decisions by allowing you to display information that is specific to your needs.

The various Enterprise Item application cards provide listings, maintenance type information, and current information that you could previously only access by running multiple standard Infor LX programs, such as Material Status Inquiry (INV300), Bill of Material Inquiry (BOM300), and Routing Inquiry (SFC100).

Optimize Your Manufacturing Today!

This enhancement to the Purchase Receipts screens; optionally shown with the quantity and weight fields populated with the open value on the purchase order. Previously the user had to manually enter the quantity received or, for a dynamic weight and measure items, the weight received for each line on the purchase order. Now the screens are populated with the open value and if the open value is the same as the value received, the user can simply accept the line.

The Receive All field on the PUR550D1-01 screen determines whether the receipt lines are populated with the open value. A system parameter controls the Receive All default value but the default value can be overridden. If the user specifies 1=Yes in the Receive All field then the PUR550D2-02 screen displays the open quantity or weight for each line. The user can accept the open value for each line. 

Optimize Your Manufacturing Today!

First7576777880828384Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements: