Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Crossroads RMC

Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3

AND Infor will no longer support LX and related products on IBM i 7.3 as of June 1, 2024

THE CLOCK is T I C K I N G ... 

MARK YOUR CALENDARS!
Effective September 30, 2023, IBM® will end support of the IBM i operating system 7.3  AND  in line with IBM’s support policy, Infor will no longer support LX and related products on IBM i 7.3 after May 31, 2024.

All Infor LX releases, patches, and related solutions will be delivered and compiled at IBM i 7.4, effective June 1, 2024. 
These deliverables will install and function on version 7 release 4 (IBM i 7.4) and above (IBM announced in May 2023 the release of V7R5M0).
NOTE: This will require your operating system to be at a minimum release level of IBM i 7.4.

This policy extends to other Infor LX-related technologies including:

  • WebTop
  • System iWorkspace (SiW)
  • Infor Development Framework (IDF)


ACTION  STEPS

We recommend you start planning your upgrade to IBM i 7.4 (*or above) to allow ample time for testing and completion prior to June 1, 2024. It is strongly recommended that you keep current to avoid these extra fees.
*Special NOTE:  All versions of LX 8.3.4 and below will see an annual 20% Extended Maintenance Fee.

Please reach out to Crossroads RMC to assist you in this planning and execution process. We have assisted many other clients with both IBM OS and Infor ERPLX software upgrades. 

800.762.2077 |  solutions@crossroadsrmc.com

Previous Article Infor LN & Baan Tip: Considerations for Release to Warehousing for a Cost Item
Next Article ERP & the Importance of Accuracy & Productivity
Print
11009 Rate this article:
5.0
Crossroads RMC

Crossroads RMCCrossroads RMC

Other posts by Crossroads RMC

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

When is the last time you took a hard look at your production lines?

  • How are we moving product through our facility?
  • Do we have work instructions/drawings available where needed?
  • Do we have frequently used inventory available at the line?
  • Where are the bottlenecks?
  • Are processes automated, where possible?

Taking a hard look at your processes and procedures may reveal some interesting results. 

Don’t assume that everyone is doing things the same way. Some may be superstars, and others may need some mentoring. Some processes may be outdated and costing you time and money, while others are extremely efficient. One area of the business may benefit from how others operate. Take the time to review and analyze your findings. Your company may benefit greatly as a result.

Optimize Your Manufacturing Today!

A major change in LX Release 8.3.5 is the ability to post Cost of Goods Sold Inventory transactions by Cost Bucket. 

This will enable reporting of Cost of Goods Sold on the P&L by Material, Labor and Overhead. 

Up to this point, companies that wished to report at this level had to develop a modification to analyze these transactions and re-book them. This new feature eliminates that need. 

Optimize Your Manufacturing Today!

First7677787981838485Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories