Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

George Moroses
/ Categories: Infor LX & BPCS Tips

Infor LX & BPCS Tip: LX 8.4 – Manufacturing Field Size Expansions

This enhancement provides expanded field sizes for many key manufacturing data elements. This expansion impacts panels, reports, work fields, as well as parameters and other technical areas.

The benefits of the expanded field enhancement include: 

  • Support for companies that have global operations in a single database.
  • Improved data accuracy due to additional decimal points.
  • Improved data accuracy due to additional capacity for totals and summaries.
  • Provides more definitions of additional values, including more meaningful values due to fewer abbreviations.
  • Provides a greater number of days for data retention.
  • Meets regulatory requirements or industry standards.
  • Avoids re-use or duplication of keys.

The programs or areas impacted include:

  • Shop Order Number (9N)
  • Summary Quantity fields (13,3)
  • DWM Summary Weight fields (13,4)
  • Transaction History Sequence (16N)
  • Instrument Serial Number (50A)
  • Item Class (5A)
  • Item Discount Code (5A)
  • Shop Order Priority Code (2N)
  • Catalog String (512A)
  • Comment (35A on ECM TITB file)
Previous Article Infor LN & Baan Tip of the Week: LN 10.7 - Inventory Check for Sales Orders
Next Article Infor LN & Baan Tip: Open Transactions Check – LN 10.7
Print
9874 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Here are 5 ways you can motivate your employees to give their best every day:

1. Train Your Employees

2. Give Your Employees the Right Tools

3. Automate Processes

4. Give Your Employees Real-Time Feedback

5. Provide Incentives to Do More

Optimize Your Manufacturing Today!

Previously, Material Requirements Planning (MRP) preferred practices meant that the component’s due date was the same as the parent’s shop order release date. Because MRP trends have changed, the preference for this due date is the day before the release date of the parent. Although Infor LX already has this functionality in Shop Order Maintenance programs (SFC500), users could not change how due dates were determined for lower level shop orders in Multi-Level Shop Order Release, SFC530D.

This enhancement provides an additional parameter for Multi-Level Shop Order Release. This parameter allows the user to change how the due date of the child components is determined. The user is now able change how the due date is determined for multi-level shop orders. If the Due Date of Children parameter is set to 1=Yes, the due date of the child components is the same as the release date of the parent. If the parameter is set to 0=No, the due date is the day before the release date of the parent.

Optimize Your Manufacturing Today!

First7980818284868788Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories