Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Infor LX & BPCS Tip: Return Material Authorization (RMAs)

The Return Material Authorization process, RMA, controls and monitors the return of goods. Infor LX generates an RMA which mirrors the terms and conditions of the return. You can copy the RMA from a processed invoice or create it independently of an existing order. If you copy an invoice to create an RMA, Infor LX copies only regular lines, not special lines. You can manually add special lines as credits on the RMA. Enter RMAs in the same manner as a customer quote. Like a customer quote, an RMA has no immediate effect on inventory, accounts receivable, sales, or the general ledger. Infor LX then generates a Return Material Document which provides the customer with the authorization to proceed with the return. Internal procedures, return reason codes, and instructional notes on the RMA identify the disposition processing. You can perform credit processing and determine update effects by entering the RMA number and assigning the appropriate order type.

Previous Article Infor LN & Baan Tip: Pro Forma Invoice
Next Article Check-Ups are important… Including Infor LX & BPCS ERP Check-Ups!
Print
21604 Rate this article:
5.0
George Moroses

George MorosesGeorge Moroses

Other posts by George Moroses

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Some items in the manufacturing process may require a lot number. A quick and easy way to release the Shop Orders with lot numbers is by using the Multi-Level Shop Order Release.

Simply select the end item from the selection screen and use action 10 for the multi-level order release. At the bottom of the release screen is the field “Pre-Assign a Lot Number to Shop Orders”. Select 1 for the pre-assigned lot number assignment option.

This option will use the pre-assigned lot number on the shop order, if the lot number exists. If the lot number does not exist, the system will automatically create a lot number and assign it to the shop order for all items that are lot-controlled.

Optimize Your Manufacturing Today!

Electronic Signature Controls have been expanded to include additional programs, files and fields.  

When manufacturing work centers are updated through Work Center Maintenance (CAP100), the system can now require Electronic Signature processing to complete the process. This enhancement allows for broader Electronic Signature controls.

Optimize Your Manufacturing Today!

First8182838486888990Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories