Please Wait a Moment
X

Infor LX Tips, Infor LN Tips, BPCS Tips, Baan Tips, Infor M3 Tips & Infor ERP News

Crossroads Connections

Infor ERP Tips & News from the Experts

Infor LX | Infor LN | BPCS | Baan | Infor M3

Frank Petrasio
/ Categories: Partner News, Infor

inPOWER 2023 - September 11 -14 - ENROLL NOW!!!

LX | XA | System21 | Enterprise Integrator



Top 10 Reasons to Attend inPower 2023

  1. New content, new training, workshops, etc…
  2. Breakout sessions conducted by users, for users
  3. Covers the big challenges: digital disruption, preparing for change, finding new talent, and, engaging our workforce
  4. Training, best practices, and tips focus on delivering immediate results in your business
  5. Face-to-face time with Infor and IBM experts and leaders
  6. The largest solution expo designed specifically for your ERP
  7. First-hand look at changes and enhancements on the Infor roadmap
  8. 100% IBMi Product Group focused – XA, LX, System21, and Thru-Put
  9. Face-to-face time with channel partners
  10. Networking, Networking, Networking! Meet people who are dealing with the same issues
     
  11. BONUS REASON: practical advice for moving away from green screens!


inPOWER Conference 2023:

Dates: September 11-14  3.5 days of fantastic content
Location: Ingleside Hotel, Pewaukee, WI
Content: Over 100 total sessions, including a keynote session
Preliminary Agenda for LX


Enroll NOW! - inPOWER 2023

Early Bird Enrollment is open thru July 31, save $200 by registering early. 

Previous Article ERP & the Importance of Accuracy & Productivity
Next Article Infor LX & BPCS Tip: What prevents tax from being calculated on a purchase order?
Print
10892 Rate this article:
5.0
Frank Petrasio

Frank PetrasioFrank Petrasio

Other posts by Frank Petrasio

Theme picker

Contact author

Please solve captcha
x

Tips:  LX | BPCS | M3

Some items in the manufacturing process may require a lot number. A quick and easy way to release the Shop Orders with lot numbers is by using the Multi-Level Shop Order Release.

Simply select the end item from the selection screen and use action 10 for the multi-level order release. At the bottom of the release screen is the field “Pre-Assign a Lot Number to Shop Orders”. Select 1 for the pre-assigned lot number assignment option.

This option will use the pre-assigned lot number on the shop order, if the lot number exists. If the lot number does not exist, the system will automatically create a lot number and assign it to the shop order for all items that are lot-controlled.

Optimize Your Manufacturing Today!

Electronic Signature Controls have been expanded to include additional programs, files and fields.  

When manufacturing work centers are updated through Work Center Maintenance (CAP100), the system can now require Electronic Signature processing to complete the process. This enhancement allows for broader Electronic Signature controls.

Optimize Your Manufacturing Today!

First8182838486888990Last

Theme picker

Tips: LN | Baan

All actions required for converting, validating, matching, and posting electronically received bank statements can be performed within a single session:

  • Bank Statement Workbench (tfcmg5610m100)
  • Bank Statement (tfcmg5610m000)

Alternatively, you can use the sequence of electronic bank statement sessions outlined below.

Steps to Process Electronic Bank Statements:

12345678910Last

Theme picker

Categories